A Patio project for a regular client of ours. We demolished the existing steps and removed the old patio slabs. A water feature was constructed using a large Limestone slab drilled for water spouts. The entire back drainage and sewerage pipework was replaced with easy to access AJ covers and Eco drains at back door. The entire step area was rebuilt with brick step risers and Limestone slabs fitted as step treads. Finally Cobble-lock patio brick were fitted to give a smooth flush look to the project.